location: conservatories | step-by-step guide
On these pages we hope that we can inform you about the process of constructing a conservatory from the ground up.
STEP 1 - Preparation
1. The Site of the proposed Conservatory 2. Construction work begins. The ground is excavated to a minimum of 450mm deep for the footings. Excavation exposes an underground drainage pipe.
3. Additional steel mesh reinforcement is introduced to the concrete foundation to prevent the drainage pipe being crushed. 4. Concrete is poured into the trench to form the foundations. The concrete is a minimum of 150mm thick.
 
5. The concrete is floated to form a level surface to build upon.  

 